Aerial view of a water treatment plant, with basins, walkways, and process buildings.

OSHA PSM 1910.119(f) · EPA RMP

Procedures your operators actually follow.

Gulf Coast water, wastewater, and chemical plants. Drafted from your documents, checked line by line, and quoted as a fixed price.

  • About 24 years running work by written procedure
  • Master Chief, U.S. Navy, Retired
  • Fixed price, not hourly

Pensacola On-site along the Gulf Coast, or remote

The work

What this work is for.

  • Written for the operator

    Clear, numbered steps in the order the work is done, with operating limits, consequences of deviation, and safety systems where the operator needs them.

  • Built to the rule

    Every operating phase in 29 CFR 1910.119(f)(1)(i), and, where the process is RMP Program 3, the parallel list in 40 CFR 68.69(a)(1). Program 2 processes use 40 CFR 68.52, which is not the same text. Limits and equipment in the procedure are written so they can be traced to the process safety information.

  • A first draft from the file you have

    AI-assisted drafting turns your existing procedures, drawings, and walkdown notes into a clean first draft in one format. Timing depends on how complete the file is, and on the review and walk-through that follow. Nothing is issued until that review is done.

  • Reviewed on every page

    Nothing is issued until it has been checked against your process safety information and walked through with your operators. Your subject-matter experts stay the approvers.

Every phase the rule names.

A covered process needs written instructions for each of these. A set that skips one is the finding that comes back.

  1. Initial startup
  2. Normal operations
  3. Temporary operations
  4. Emergency shutdown
  5. Emergency operations
  6. Normal shutdown
  7. Startup after a turnaround, or after an emergency shutdown

Emergency shutdown includes the conditions that require it, and which qualified operators are responsible for carrying it out. Operating limits, consequences of deviation, and the steps to correct or avoid deviation are in 29 CFR 1910.119(f)(1)(ii). Where the process is RMP Program 3, the parallel phase list is 40 CFR 68.69(a)(1). Program 2 processes use 40 CFR 68.52, which is not the same text. The PSM phase list is 29 CFR 1910.119(f)(1)(i).

The problem

Operators stop following a procedure that does not match the work.

OSHA and EPA already require these procedures. A common finding is that the document does not match the way the covered process is actually run.

  1. Written for the file, not the shift.

    Steps out of order. Operating limits in an appendix. Consequences of deviation missing. The person at the equipment cannot use it, so they stop using it.

  2. The plant changed. The SOP did not.

    A valve, a setpoint, or a temporary lineup moved under management of change. The procedure still describes the old plant. Annual certification becomes a signature on a document no one trusts.

  3. The same finding, the next audit.

    Missing phases — emergency shutdown, temporary operation, startup after a turnaround — return because rewriting the set keeps losing to the day’s work.

Valves, instruments, and process piping in an industrial plant.
Process piping. The steps have to match what is actually installed.

Packages

Four ways to commission the work.

The figure you approve is a fixed quote, set after a scoping call. The ranges below are the bands those quotes fall in.

Single Procedure

One operating procedure or SOP, drafted, reviewed, and operator-validated.

Quoted range $1,500–$2,500

5-Procedure Pack

Five related procedures in one consistent format. Best value for a unit or system.

Quoted range $6,500–$10,000

Full Process Set

The complete operating-procedure set for one PSM- or RMP-covered process, all required phases.

Quoted range $12,000–$22,000

Annual Procedure Upkeep

Up to 20 procedures kept current through the year, plus support for your annual certification. Your facility still performs that certification.

Quoted range $4,500–$9,000 / yr

Ranges shown. Your fixed quote depends on process complexity, the number of phases, and how complete the documentation is. Delivered in Word and PDF.

How it works

From the file you have to a procedure the shift will run.

  1. 01

    Send what you have

    Current procedures, piping and instrumentation diagrams, process safety information, and a walkdown with your operators.

  2. 02

    Drafted in one format

    AI-assisted drafting produces a clean first draft from those documents and notes. Limits come from your process safety information.

  3. 03

    Review, then a walk-through

    Line-by-line technical review by the principal, then a walk-through with the people who run the equipment. Your experts remain the approvers.

  4. 04

    Issued for your certification

    Word and PDF, ready for the annual certification your facility performs. Critical Path Procedures does not certify the plant.

Who it's for

Built for water and wastewater utilities, and for PSM-covered chemical processes.

Clarifiers and aeration basins at a water treatment plant, seen from above.
Clarifiers and aeration basins. Where this practice starts.

Where the work starts

Water and wastewater utilities

Municipal systems with chlorine, ammonia, or sulfur dioxide equipment covered by the EPA Risk Management Program or OSHA PSM.

The same standard

Chemical and manufacturing plants

Processes covered by OSHA PSM that need operating procedures written to 29 CFR 1910.119(f).

The buyer

PSM, operations, and compliance leads

People facing annual certification, an audit finding, or a backlog of management-of-change items that never made it into the SOP.

The corridor

Gulf Coast, on-site or remote

Florida Panhandle, Alabama, Mississippi, and Louisiana. From Pensacola and Mobile across the corridor. Remote work is welcome.

Portrait of Greg Prichard, principal of Critical Path Procedures.
Principal Pensacola

The principal

Greg Prichard

Master Chief, U.S. Navy, Retired · B.A.S., Applied Science Technology · M.Ed., Educational Leadership

Greg Prichard spent about 24 years as a nuclear-field submariner in naval nuclear power plant operations, maintenance, and training. Those years were spent writing, running, and enforcing operating procedures, in a place where a procedure is followed exactly or the work stops.

He is now a senior manager in defense consulting. His education, in applied technology and in how people learn, is why a procedure is written the way an operator learns the work: numbered steps, in order, with the limit and the consequence on the step.

Critical Path Procedures writes and rewrites operating procedures for water, wastewater, and chemical facilities covered by OSHA Process Safety Management and the EPA Risk Management Program. It does not offer commercial nuclear power services. It is an independent business, not affiliated with or endorsed by the U.S. Navy, the Department of Defense, Naval Reactors, or any other U.S. government agency.

Questions

Before the scoping call.

What do you deliver?

A written operating procedure, or a set of them, in Word and PDF. Steps are numbered in the order the work is done. Where OSHA PSM applies, the set is written to cover the operating phases in 29 CFR 1910.119(f)(1)(i). Where EPA RMP Program 3 applies, it is aligned with 40 CFR 68.69; Program 2 processes use 40 CFR 68.52. Your operators walk through it before it is issued.

Who approves the procedure, and who certifies it?

Your subject-matter experts remain the approvers of record. Critical Path Procedures drafts, reviews, and revises. The facility performs its own annual certification. Support on the retainer is help preparing for that certification. It is not a signature in place of yours.

Will this clear an audit finding?

A procedure built to the rule and checked against your process safety information is aimed at the usual finding: the written procedure does not match the covered process, or a required phase is missing. No one can promise an inspection outcome.

How is artificial intelligence used?

Drafting is AI-assisted, which is how a clean first draft can be produced from the procedures, drawings, and walkdown notes you already have. Timing depends on the file and on the review. Operating limits are taken from your process safety information. They are not guessed. Nothing is issued until the principal has checked it line by line and the people who run the equipment have walked through it.

What do you need from the plant?

Current procedures, piping and instrumentation diagrams, process safety information, and time with the operators for a walkdown. If the file is thin, say so on the scoping call. The quote depends on it.

How is the price set?

The ranges on this page are bands, not a menu of flat fees. You receive a fixed quote after a scoping call. It depends on process complexity, the number of phases, and how complete the documentation is.

Where do you work?

The practice is based in Pensacola, Florida. On-site work covers the Gulf Coast: the Florida Panhandle, Alabama, Mississippi, and Louisiana, from Pensacola and Mobile across the corridor. Remote work is welcome, including when a walkdown can be done with your people and the documents are in hand.

Is this a nuclear consultancy, or affiliated with the Navy?

No. Greg Prichard is a retired Master Chief, U.S. Navy, and a nuclear-field submariner, and that is where the procedure discipline comes from. Critical Path Procedures does not offer commercial nuclear power services. It is an independent business, not affiliated with or endorsed by the U.S. Navy, the Department of Defense, Naval Reactors, or any other U.S. government agency.

Contact

Have a procedure that needs work?

Email for a scoping call and a fixed quote.

Greg Prichard

Principal, Critical Path Procedures LLC

greg@criticalpathprocedures.com

Pensacola, Florida

Fields marked * are required.

Reply within one business day.

Request a fixed quote