Follow the step, or stop and fix the step

In the work I came from, a procedure was the way the work was allowed to proceed. A step was followed as written. If it could not be followed as written, the work stopped and the procedure was corrected. The work did not continue on a version that lived in someone's memory.

These are general principles. Other industries that cannot afford a skipped step use the same idea. This article does not describe any naval system, any nuclear plant, or any classified practice. It is not guidance from the Navy, the Department of Defense, or Naval Reactors. I am not saying a commercial plant has to copy a military manual. 29 CFR 1910.119(f) and 40 CFR 68.69 are the rules for covered chemical processes. The notes below are how I write a page so those rules produce something the shift can follow.

The procedure is the instruction

If the procedure is advice, people will change it in the field. Some of those changes are real. Some of them skip a check that exists because someone was hurt. Once changing the step in the field is normal, you have a document and a local practice, and they drift.

Perform the step as written. If the step is wrong, stop. Fix the step through the change process the facility already uses, then do the work. "Make it work and tell someone later" is how the written page becomes fiction.

This fails if supervisors praise the person who got the job done by ignoring a bad step, and punish the person who stopped. People follow the incentive. If stopping is treated as delay, they will not stop.

One action, in order, with the check on the step

A step the operator can follow does one action. It names the component the way it is labeled in the field. It says what the operator should see if the action worked. If the order matters, the steps are in that order.

The operator has to know which step they are on. Circular steps, "repeat as needed" with no end condition, and steps that say "ensure" with no indication are where that breaks. The operator cannot mark a step complete if the step never says what complete looks like.

Where a limit controls the decision, the limit is on the step, with the consequence of deviation and the corrective action. That is also what 1910.119(f)(1)(ii) and 68.69(a)(2) require for operating limits. The number and what the number means belong on the step, not in a different book.

Write the stop condition

"Use good judgment" is not a stop condition. A stop condition says what is true in the field when the operator halts, and what they do next. The shape, not anyone's limits: a reading outside the stated band, a safety system that is not in the required state, a label that does not match the procedure, a step that cannot be performed as written.

Emergency shutdown is a stop condition the rules already specify. The procedure states the conditions under which emergency shutdown is required, and which qualified operators are responsible, so the shutdown can be done safely and in time. "Shut down if necessary" has not written the condition or the responsibility.

The stop has to be allowed when nothing is on fire. The point of a written stop is to act before the consequence. If a precautionary stop is treated as overreaction, the stops will not be used.

Correct the procedure when the practice changes

Every informal workaround is a candidate permanent error. The first time, it is a judgment in a tight spot. The tenth time, it is how the unit is run, and the written procedure is how the unit is audited. 1910.119(f)(3) requires procedures to reflect current operating practice. If current practice is the workaround, either the procedure changes to match a practice that is still safe and consistent with the process safety information, or the practice stops. Leaving both in place means the certification is signing a document the shift does not use.

When a step cannot be followed, record what was different, correct the procedure or the plant, and train the people who operate it before they rely on the new step. 1910.119(l) already expects modifications to operating procedures to be addressed as part of managing a change, and expects affected people to be informed before startup.

The people who do the work prove the draft

A procedure that has not been walked by the people who perform it is an untested instruction. Walking it means reading each step at the equipment. The walk finds wrong names, impossible order, missing indications, and limits that do not match the instrument in front of the operator.

Facilities assign approvers. Those approvers should be the people accountable for the process, and they should have the walkdown in hand when they approve. I can draft the page and insist on the shape. I do not declare the procedure suitable. The facility does.

The covered process, in each required phase, needs steps a qualified person can follow as written. Judgment belongs where the procedure says to use it, inside limits the procedure states. This does not require military formatting, naval terminology, or any manual from any service. The standard I carry over is the one in the first paragraph: follow the step, or stop and fix the step.